What does AQL mean in garment quality control?
AQL means acceptance quality limit: the share of defective units agreed as acceptable before an order is placed. We check against it at two points rather than one: inline while the order is still on the line, and in a final AQL inspection before dispatch, so a fault is caught during production instead of after it.
Why there are two inspections
Quality control is stage six of seven, and it is a multi-stage process rather than a single check at the end. Inline inspection runs during production, so drift in measurement or stitching shows up in the first pieces while there is still time to correct the run. The final inspection runs before packaging and dispatch.
What each one catches
The inline check catches repetition - the same fault appearing across pieces while the line can still be adjusted. The final check confirms that what leaves the floor matches the approved sample on fit, fabric, colour and labels. Between them the two cover the run rather than a sample taken from it.
Why it matters on a repeat order
Reorders run at 15-25 days against 30-60 for a first order, and that speed only holds if the first run was consistent enough that nothing has to be reworked. That is what the two checkpoints protect. It matters most where a second batch has to match the first exactly: school uniform and corporate workwear orders, a denim programme shipping in waves, or a t-shirt and jacket range restocked through a season.
Where it sits in the process
The seven stages are design and tech pack, sourcing, sampling, approval, production, quality control, packaging and dispatch. Inspection is not bolted on afterwards - the inline check happens inside production itself, and the final check gates the packaging step.
Ask what the inspection points are for your style when you send the brief. The answer tells you how the run will be controlled.